Srpski / Engleski

Welcome to our website!






INDUSTRIAL FLOORS




Here you can get acquainted with all the important information related to our business. We are engaged in the installation of concrete, ferro-concrete and leveling layers (liners). Independently or in cooperation with other companies that deal with these and other matters, we are able to realize all the work around the installation of concrete and ferro-concrete in your business and other facilities. We are ready to answer your specific requirements and to accommodate your needs. This is just part of the services that we are able to offer you. For more information, see the section SERVICE.


Many years of experience we have gained in course of their work, many references and business contacts certainly guarantee that we will work to realize high quality, while respecting deadlines and within your budget. If you want to look at some of the projects we have worked on the section, visit the PHOTO GALLERY.


If you decide to trust us you can contact us CONTACT section.

hala Altina hala Beograd hala Beograd hala Beograd hala Beograd hala Dobanovci hala Dobanovci hala Dobanovci hala Dobanovci hala Dobanovci hala Indjija hala Indjija hala Indjija hala Odzaci Omega profeks Omega profeks Omega profeks Omega profeks Omega profeks Omega profeks Omega profeks Omega profeks Omega profeks Omega profeks Omega profeks Omega profeks Omega profeks hala Osecina hala Osecina hala Osecina hala Osecina hala Ruma hala Sabac hala Sabac hala Sabac hala Sabac hala Sabac hala Sabac hala Sabac hala Sabac hala Sabac hala Sabac hala Sabac hala Sabac






SERVICES




Concrete slab latest laser technology


Concrete is a very important issue for making a quality floor. When spreading must be well vibrated for what used screed, or, depending on the situation, vibrating needle. Bed and leveling concrete is made rulers with constant control laser technology. It is essential to have adequate concrete cell with a constant concrete and large capacity that can meet the needs of contractors.


Assembly and processing of ferrous concrete


Ferobetnon be installed by a uniform layer sprinkled on fresh izlivenoj concrete slab in one or two stages. Application rate of 3-5kg per square meter depending on the material manufacturer. After removal or evaporation of water from the surface of fresh, moist and full compact concrete first part corresponding powder (2.5 kg per m2) should be scattered evenly on the plate. The first amount should be embedded in concrete on the surface and immediately afterwards sprinkled with part two. Processing is done by double machine trowel until the mixture is completely pressed into the fresh concrete surface from which it draws the required amount of water. Processing of rotational float should follow the gradual hardening of concrete. Substrate processing is performed repeatedly until completely smooth surface is achieved. Installation forobetona must not be interrupted until the full treatment is not started slabs of concrete.


Levelling layers (jacket)


One of the most applicable type of flooring is cement screed. Because of its good osobnina often installed in buildings where the floor structure is exposed to heavy traffic such as floors cell halls, factory halls, warehouses, and other similar facilities. It is also suitable for floor construction elements which carry the installation of underfloor heating. It can be installed on concrete or over insulating layers, and can be used as a floor, or coated with a variety of floor coverings. 's Flat, evenly spreads the weight of the floating floor and has no pronounced deformation. Depending on the performance of screeds may be supporting function, or can be used for protection against moisture, the thermal and sound insulation.


Cutting


The joints are usually about 0.3 cm wide and should slot within 24-48h after treatment Ferobeton. The joints depends on whether the concrete reinforcement mesh, or concrete with steel fibers. The joints are often filled with polyurethane masses after complete drying of concrete, ie after 28 days.


If necessary, the services rubble.